From weekly deploys to on-demand in six weeks
A 42-engineer team was releasing every Wednesday with a two-hour freeze window. We rebuilt their GitHub Actions pipelines, introduced a merge queue, and moved their integration tests off the critical path.
Result: 4 deploys/week → 11/day. Rollback rate dropped from 14% to 3%.


